|
ALLSPORTS
Turn Key Projects has designed, fitted and project managed over
300 store fit-outs for the All Sport chain. The Meadowhall store
in Sheffield was completely gutted and refitted in a 10 day time
frame. The fit-out involved installing a new mezzanine floor, staff
facilities, air conditioning and a full shop fit.
JD SPORTS
TK Projects has been appointed by JD Sports to re-brand the Allsports
stores to the JD format. Following these installations we were asked
to fit-out the new Dalziel & Pow concept stores in Stratford
and Croydon, together with sub contract work in the stores in Edinburgh.
BRAND FUSION
We have completed several design and fit-out contracts for Pentland
plc, trading under the brand name of Brand Fusion at Doncaster,
Livingstone, Bridge End and Braintree.
THORNTONS PLC
We have been appointed by Thorntons plc to design a concept Chocolate
Shop and Coffee House and have subsequently fitted out the concept
store at the McArthur Glen Centre, J38 M1 Mansfield.
Following success of this store we designed and
fitted a coffee and ice cream shop in a grade ii listed Victorian
tram stop in the new Portsmouth regeneration centre at Gun Wharf
Quays. This project was followed with designs for new coffee stores
at Bournemouth, Castlepoint, near Glasgow, Wolverhampton and others.
MOSS BROS
During 2007 we carried out a major design and refit of the flagship
Moss Bros store on Oxford St, London and also the group’s
store in Peterborough.
<<
-- Previous
|